Shipbuilding production management and logistics control are studied so as to find an advanced shipbuilding production logistics management style.The necessity and feasibility to integrate MRP-Ⅱ(manufacture resource planning)and JIT(just-in-time)are researched properly following the comparison of MRP-Ⅱ and JIT and the analysis of shipbuilding production characteristics.A shipbuilding logistics system combining MRP-Ⅱ with JIT is set up and discussed according to a master production schedule(MPS),MRP and workshop-floor production control.The system is able to simplify the shipbuilding production plan,balance the workshop production,stabilize the supply,and inspire positivity and creativity so as to raise the shipbuilding production management level.